Toronto (de Havilland)

PPS Revision Notice #2017-028M

 
PPS 1.09 Issue 30 - Drilling and Reaming

     Summary of Changes:


PPS 9.22 Issue 28 - Assembly of Connectors

     Summary of Changes:


PPS 9.34 Issue 29 - Terminating Electrical Shields

     Summary of Changes:


This revision notice lists brief summaries of technical changes introduced for each of the revised PPS's.  Please note that these summaries are not detailed and are intended only to assist in alerting users to changes which may affect them; refer to the applicable PPS for authorized, detailed procedure and requirements.

 
Page created and maintained by:  Bombardier Toronto (de Havilland) - Core Methods (PPS)