Toronto Site

PPS Revision Notice #2017-013

 
PPS 13.39, Issue 5 - Bombardier Toronto Engineering Process Manual

     Summary of Changes:


PPS 21.20, Issue 30 - Mixing and Handling Two-Part Sealants

     Summary of Changes:

PPS 36.07, Issue 11 - Metal to Metal and Metal to Metal Honeycomb High Strength Bonding using DHMS A6.03 Adhesive Film and Primer

     Summary of Changes:


 
This revision notice lists brief summaries of technical changes introduced for each of the revised PPS's.  Please note that these summaries are not detailed and are intended only to assist in alerting users to changes which may affect them; refer to the applicable PPS for authorized, detailed procedure and requirements.
 

 
Page created and maintained by:  Bombardier Toronto (de Havilland) - Core Methods (PPS)