Toronto Site

PPS Revision Notice #2017-019

 
PPS 13.09, Issue 17 - Installation and Removal of Aircraft Tires

     Summary of Changes:


PPS 21.18, Issue 9 - Sealing Firewalls and High Temperature Zones

     Summary of Changes:


PPS 30.12, Issue 7 - General Steel Heat Treatment

     Summary of Changes:


 
This revision notice lists brief summaries of technical changes introduced for each of the revised PPS's.  Please note that these summaries are not detailed and are intended only to assist in alerting users to changes which may affect them; refer to the applicable PPS for authorized, detailed procedure and requirements.

 
Page created and maintained by:  Bombardier Toronto Site - Core Methods (PPS)